Project Details

  • Clients MEDCO ENERGI
  • Team PSI
  • Services U STAMP Pressure Vessels
  • Category Equipment fabrication

Located in

SOUTH TUNISIA (REMADA)

year

2014

Scope of Work :

Design, supply, manufacturing, testing and installation of a three phase separator MBD-100. the separator package include :

  • Tank with its internals.
  • Platform, pipe supports and instruments.
  • Lot of pipes and manual valves.
  • External painting.
  • Lot of measuring instruments, control and regulation.
  • Lot of electrical and accessories.
  • Third party inspection.