Société Mauritanienne des Hydrocarbures (SMH)
Welcome to our site
2023
Welcome to our site
Mauritania
SOW :PSI will be responsible for all earthworks, civil engineering and roadworks, as well as the electrical and instrumentation work required to prepare, execute and complete the project in accordance with international and local standards.
The hydrocarbon pipelines consist of :
-
A 1.5 km line of 10” SCH STD in A106 GrB pipe for the transport of Gasoil & Petrol
-
A 1.2 km line of 10” SCH STD pipe in A106 GrB for transporting kerosene
-
A 1.5 km 10” SCH STD pipe line in A106 GrB for transporting Fuel Oil (HFO)
-
A 5.5 km 10” SCH STD pipe line in A106 GrB for transporting LPG
-
A 1.5 km water pigging line in 6” SCH STD pipe in A106 GrB